23/02/2019 – 08:00 till 18:00 – Horsham Power – Planned Maintenance

On the 23rd February 2019 starting from 08:00 our UPS vendor Vertiv will be undertaking a planned upgrade to the system adding additional battery capacity to our Horsham facility. Normally with this type of work the UPS would be placed on “bypass” however the nature of the works require a complete decommission of the system … Continue reading “23/02/2019 – 08:00 till 18:00 – Horsham Power – Planned Maintenance”

On the 23rd February 2019 starting from 08:00 our UPS vendor Vertiv will be undertaking a planned upgrade to the system adding additional battery capacity to our Horsham facility.

Normally with this type of work the UPS would be placed on “bypass” however the nature of the works require a complete decommission of the system which will require a complete isolation and removal of power to feed “B”

Each cabinet is supplied with a redundant “A” supply. All of our critical services and client facing platforms are dual feed so no outages are expected however should be considered at risk until the completion of the works.

We will be contact clients with co-location who have devices that are not dual redundant.


UPDATE 01 – 08:00

Engineer’s are now on site. Work will start shortly.

UPDATE 02 – 08:30

Work has started and power isolated.

UPDATE 03 – 13.00

Work is now complete and redundancy restored.