NOC: Planned Maintenance – 24/07/2013 – 22:00 till 25/07/2013 – 02:00 – LON01 Goswell Road

In line with our previous upgrade work to LON01 we are now ready to “bring up” our BGP sessions to our new and existingt transit providers. During this time there may be a period of routing instability, however no service outages are expected. **UPDATE 01 @ 18:44 – 24/07/2013** Engineers are now onsite and will … Continue reading “NOC: Planned Maintenance – 24/07/2013 – 22:00 till 25/07/2013 – 02:00 – LON01 Goswell Road”

In line with our previous upgrade work to LON01 we are now ready to “bring up” our BGP sessions to our new and existingt transit providers. During this time there may be a period of routing instability, however no service outages are expected.

**UPDATE 01 @ 18:44 – 24/07/2013**
Engineers are now onsite and will start to prepair for this work.

**UPDATE 02 @ 21:54 – 24/07/2013**
Engineers are now ready to start this work.

**UPDATE 03 @ 00:54 – 25/07/2013**
Engineers have now completed this work and our BGP sessions to our new peers are live, we are now solely announcing our IP space from our ASN (AS199283) Fail-over between links has been tested and completed successfully. Some routing instability maybe seen over the next 12-48 hours while BGP tables update to reflect our ASN, however should be minimal.

No outages where experienced durning this window, other than testing which lasted 15 seconds.

UPDATE 04 @ 16:33 – 25/07/2013 FINAL
90% of the world IPv4 registers now see our ASN and we are happy that the remaining will update over the next 12 hours and be reflected via RIPE.

    This work is now complete