LON01 – 11/11/2015 – 23:00 till 03:00 – EasyXDSL – Emergency Maintenance *COMPLETE*

We have been advised this afternoon by one of our interconnect providers that that they will be conducting a software upgrade on there core Junos router at Telehouse North between 23:00 and 03:00 tonight. This upgrade work will affect one of our fibre waves we use for DSL termination back in to our network at … Continue reading “LON01 – 11/11/2015 – 23:00 till 03:00 – EasyXDSL – Emergency Maintenance *COMPLETE*”

We have been advised this afternoon by one of our interconnect providers that that they will be conducting a software upgrade on there core Junos router at Telehouse North between 23:00 and 03:00 tonight. This upgrade work will affect one of our fibre waves we use for DSL termination back in to our network at Goswell Road. DSL traffic traversing over this link will drop during the maintenance window, however should re-establish over an alternative link via Telehouse East which is unaffected.

The nature of these works include a reload of the Junos hardware at Telehouse North by our wave supplier and in theory should be the only disruption we see. Unfortunately sort disruptions like this will cause multiple DSL PPP session re-terminations as they flip back and forth between Telehouse North & Telehouse East as our network is designed to use the former where possible. Due this concern and avoiding any other unforeseen issues that will cause session drops during the maintenance windows, we will be manually shutting down the Telehouse North link at 22:50 tonight with the view of bringing it backup at 07:00 tomorrow morning. This will limit the session drops to these times and provide a stable service throughout.

We apologise for any inconvenience this may cause.

UPDATE 01 – 18:45

We have reviewed the original manual switch over time and concluded it does not allow any contingency should this be required. We have therefor updated this to 22:00
UPDATE 02 – 07:10 – 12/11/2015

This work is complete.