12-10-2017 – 01:00 till 03:00 – Planned Maintenance: Level3 – Goswell Road

Level 3 intends to carry out internal maintenance within its network. This has been classified as ESSENTIAL. The nature of this work is to perform a Network Element software upgrade. Level 3 will Upgrade BB2 ALU 7950 routers to code level SROS-14.0.R5-1 This will fix 100gb/10gb uplink error and a p-chip false alarm error. This … Continue reading “12-10-2017 – 01:00 till 03:00 – Planned Maintenance: Level3 – Goswell Road”

Level 3 intends to carry out internal maintenance within its network. This has been classified as ESSENTIAL. The nature of this work is to perform a Network Element software upgrade. Level 3 will Upgrade BB2 ALU 7950 routers to code level SROS-14.0.R5-1 This will fix 100gb/10gb uplink error and a p-chip false alarm error. This will also bring us up to date with Vendor code level recommendation.

During this window we expect to loose our Level3 peering as it requires a reload of the affected router. Traffic will automatically re-route across other paths on our network.

Leave a Reply